Activity Completed For Song Dam Drinking Water Project (Uttarakhand)
- Topographical Survey.
- Geological Investigation.
- Exploratory Drilling.
- Exploratory Drifting.
- Geophysical Investigation by Geophysical Division of GSI and Parsons.
- Petrological Studies by Petrology Division, GSI (Geological Survey of India).
- Geotechnical testing by IRI Roorkee and CSMRS (Central Soil and material Research Station) New Delhi.
- Hydrological and Sedimentation Studies carried out by Tractable Engine and vetted by Central Water Commission, New Delhi.
- Seismic Parameters Studies & Micro Earthquake Studies by ITI Roorkee and approved by Control water Commission (NICSDP).
- Mix Design by IRI Roorkee.
- Construction material test by CSMRS, New Delhi.
- Model Study by IRI Roorkee in progress.
- Fault Displacement Hazard Assessment.
- Dynamic Analysis of overflow of non-overflow block of Song Dam.
- 3D Geotechnical Modeling.
Ongoing Activity
- Construction of two Lane Approach Road from Dwara Bridge (Maldevta) to Dam Site and two lane 60 m span Steel Bridge at Dwara (Maldevta) for Song Dam Drinking water project in Raipur Block, Distt. Dehradun
- Construction of 66m span steel truss Bridge over Song Dam river on Maldevta to Sondhana village motor road