Activity Completed For Song Dam Drinking Water Project (Uttarakhand)

  • Topographical Survey.
  • Geological Investigation.
  • Exploratory Drilling.
  • Exploratory Drifting.
  • Geophysical Investigation by Geophysical Division of GSI and Parsons.
  • Petrological Studies by Petrology Division, GSI (Geological Survey of India).
  • Geotechnical testing by IRI Roorkee and CSMRS (Central Soil and material Research Station) New Delhi.
  • Hydrological and Sedimentation Studies carried out by Tractable Engine and vetted by Central Water Commission, New Delhi.
  • Seismic Parameters Studies & Micro Earthquake Studies by ITI Roorkee and approved by Control water Commission (NICSDP).
  • Mix Design by IRI Roorkee.
  • Construction material test by CSMRS, New Delhi.
  • Model Study by IRI Roorkee in progress.
  • Fault Displacement Hazard Assessment.
  • Dynamic Analysis of overflow of non-overflow block of Song Dam.
  • 3D Geotechnical Modeling.

Ongoing Activity

  • Construction of two Lane Approach Road from Dwara Bridge (Maldevta) to Dam Site and two lane 60 m span Steel Bridge at Dwara (Maldevta) for Song Dam Drinking water project in Raipur Block, Distt. Dehradun
  • Construction of 66m span steel truss Bridge over Song Dam river on Maldevta to Sondhana village motor road